On 14.02.2014, the Department failed to place on record of Hon'ble CAT Bench Chandigarh the progress report of revision in Recruitment Rules of PS Group 'B' cadre. On the request of Learned Counsel on behalf of Department, matter has now been posted to 05.03.2014 for submission of progress report.
Source : Punjab Circle Blog
Source : Punjab Circle Blog
To avoid delay/confusion/loss to the cadre etc, the following strategy may be adopted :
ReplyDelete(a) All the Sr PM post may be surrendered for general line just like what happened for HSG-I Postmaster(IP line) post
(b) Instead, against these surrendered posts, we may ask for creation of new posts (Group B) at RO/CO as AD(BD) and AD(Tech) etc as the existing AD(BD) and AD(tech) posts at RO/CO are not created but diverted/temporarily attached by abolishing the SP PSD/Dy SPOs posts in many circle. By creating new posts of AD(BD)/Tech there will be a full fledged ADs for BD and tech aspect who will be directly reporting to PMG(BD)/DPS(BD) which are newly created/redesignated.
(c) In respect of division, every big division consisting of more that 3 sub division may be headed by SSP and deputy SP post should be created in such division to assist the SSP in Inspection/investigation work etc.
Nowadays, being a head of division is very difficult for many reason/ including high work pressure and unimaginary targets fixed. For smoother functioning without pressure following demands may also be putforth :-
(a) All the division irrespective of number of subdivision should be headed by SSP (JTS)
(b) The APMG/ADG posts at Regional office/circle office/Dte should immediately be downgraded to AD posts so that no JTS can work in RO/CO/Dte in in their initial stage of appointment (untill he is promoted to JAG).
By doing so, all the direct IPS officer can't escape from the role of heading the division and achieving the unimaginary target assigned to division nowadays which in turn safeguard the promotee Group B officers in a long run.
For this we can show some matching savings in the shape of givingup the Sr PM posts/downgrading the APMG/ADG Posts as well as those skeleton posts of Dy chief postmaster at GPOs etc.